VIDEO. The Tailings of Arzvankik Are Filling the Norashenik River
Following the alerts about the tailings of Arzvankik that circulated on the internet, on August 24, inspectors from the Environmental and Mining Inspection Body's Syunik territorial division, along with employees of the Zangezur Copper-Molybdenum Combine, conducted a joint investigation at the tunnel entrance of the runoff waters being expelled from the Arzvankik tailings.
Water samples were taken for laboratory analysis. An administrative proceeding has been initiated by the inspection body, as reported by the Environmental and Mining Inspection Body.
It is noteworthy that the video was shared by journalist and environmentalist Tehmine Yenokyan.
Նմանատիպ հոդվածներ
Delay of Peach Trucks Not Related to Legal Proceedings Against Spayka, Says Tigran Khachatryan
The delay of trucks loaded with peaches at the Upper Lars checkpoint is not related to legal proceedings against the Spa...
Opposition Holds Unauthorized March in Moscow, Arrests Occur
In Moscow, an unauthorized march against "political repression" is taking place, according to meduza.io. The march start...
38 Dogs Brought to Center in Two Days: Stray Animal Control in Arabkir
Stray animal control efforts have been carried out in the Arabkir administrative district. This was reported by the Arab...
I Won't Leave Any Stone Unturned: Statement from Dismissed Deputy Governor
The deputy governor of Vayots Dzor Marz, Razmik Tonoyan, has been dismissed from his position. He has promised to make a...